Type of Work: 20km Motorway, 1 Tunnel (Lenght: 387m), 3 Bridge (Lenght: 52m, 23m and 48m)
1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Soil investigations
8- Geotechnical studies, drilling works, laboratory tests and reporting
9- Bridge, Tunnel, Viaduct, and Walls Design
10- Traffic Project Design
11- Preparing of final design and application drawings
12- Preparation of bill of quantities and cost estimates
Value M US ($): 289,926
Contractor or Sub-Contractor: General Directorate of Highways
Start and Complated Dates: May 2010 and January 2013
Owner: General Directorate of Highways
Contact Person: Kemal Gürol ÖKSÜZ (7th regional directorate, SAMSUN)