Type of Work: 3km Village Road, 8km access road, River Diversion of Sarız Stream 1.5km (flood discharge of 100 year is 540 m3/sec), River Diversion of Demirci Stream 1.0km (flood discharge of 100 year is 172 m3/sec)

1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Refaining Walls Design
8- Traffic Project Design
9- Preparing of final design and application drawings
10- Preparation of bill of quantities and cost estimates

Value M US ($): 110,000
Contractor or Sub-Contractor:
Start and Complated Dates: December 2010 and February 2012
Owner: Enerji-SA Power Generation Co.
Contact Person: Miraç Alış
Mustafa Yörükoğlu