Type of Work: 41 km State Highway

1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Soil investigations
8- Geotechnical studies, drilling works, laboratory tests and reporting
9- Bridge, Tunnel, Viaduct, and Walls Design
10- Traffic Project Design
11- Preparing of final design and application drawings
12- Preparation of bill of quantities and cost estimates

Value M US ($): 421,193
Contractor or Sub-Contractor: General Directorate of Highways
Start and Complated Dates: January 2011 and Ongoing
Owner: General Directorate of Highways
Contact Person: Ayhan Bacak (13th regional directorate, ANTALYA)