Type of Work: 13km Artvin – Erzurum Motorway Project 3 Tunnel (Lenght: 1172m, 870m, 470m), 5 Steel Bridge, 12km (Artvin-Ardanuç) Junction.- Ardahan Motorway Project, 4 Steel Bridge, 8km (Artvin-Ardahan ) Junction.- Ardanuç Motorway Project

1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Soil investigations
8- Geotechnical studies, drilling works, laboratory tests and reporting
9- Bridge, Tunnel, Viaduct, and Walls Design
10- Traffic Project Design
11- Preparing of final design and application drawings
12- Preparation of bill of quantities and cost estimates

Value M US ($): 233,750
Contractor or Sub-Contractor: Sistem Elektromekanik Tesisler Sanayi Ticaret A.Ş.
Start and Complated Dates: December 2010 and July 2014
Owner: General Directorate of Highways, General Directorate of State Hydraulic Works
Contact Person: Can HÜRMEYDAN (Contractor or Sub-Contractor)
Ender ERÇİN (Owner: General Directorate of Highways )