Type of Work: 23km İspir Yusufeli Motorway, 1km Çamlıkaya provincial roads relocation 1 Viaduct (Height: 45m – Lenght: 140m), 2 Tunnels (Lenghts: 395m and 1275m), 16km Sırakonaklar Village Road, 8km Karakale Village Road, 1km Taşlıca Village Road (1 Viaduct)

1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Soil investigations
8- Geotechnical studies, drilling works, laboratory tests and reporting
9- Bridge, Tunnel, Viaduct, and Walls Design
10- Traffic Project Design
11- Preparing of final design and application drawings
12- Preparation of bill of quantities and cost estimates

Value M US ($): 881,309
Contractor or Sub-Contractor: DOKA Power Generation Co. Sabancı Holding (Merged into Enerji-SA)
Start and Complated Dates: April 2008 and September 2014
Owner: General Directorate of Highways, Erzurum Provincal Administration
Contact Person: Emre Kaytan (Contractor or Sub-Contractor)
Volkan Çeri (Contractor or Sub-Contractor)
Gökhan Genç (Owner)