Type of Work: 49 km motorway, 25 km access roads, 6 Bridge (Lenght : 138m, 103m, 105m, 131m, 154m, 100m)

1- Feasibility study for corridor
2- Topographical studies and mapping of the alignment
3- Design of grade line including profile and cross section drawings and reviewing it on site
4- Hydrological studies, hydraulic calculations and design of drainage structures
5- Calculation of excavation volumes, preparation of mass diagram and design of other appurtenant structures
6- Design of intersections
7- Soil investigations
8- Geotechnical studies, drilling works, laboratory tests and reporting
9- Bridge, Tunnel, Viaduct, and Walls Design
10- Traffic Project Design
11- Preparing of final design and application drawings
12- Preparation of bill of quantities and cost estimates

Value M US ($): 822505
Contractor or Sub-Contractor: Enerji-SA Power Generation Co.
Start and Complated Dates: February 2011 and December 2014
Owner: General Directorate of Highways, Muş Provincal Administration
Contact Person: İnan ÖZASLAN (Contractor or Sub-Contractor)
Mehmet TUTAŞ (Owner: General Directorate of Highways )